EVRAZ KGOK Switches to New Gas Filling System

1 June 2018 (09:41)

UrBC, Yekaterinburg, June 1, 2018. EVRAZ Holding’s Kachkanar Ore Mining & Processing Enterprise (KGOK) and Gazpromneft launched the Fuel Integrator Project together, EVRAZ Holding Ural’s corporate relations center reports.

The Fuel Integrator scheme, proposed by the local sales division of Gazpromneft, means the holding can have its vehicles filled with fuel without any production stoppages as well as cut its fuel spending and be in full control of all the costs involved.

To make sure EVRAZ KGOK has its fuel needs fully met, Gazpromneft bough three additional filling units (overall capacity: 100,000 kg) and five mobile filling stations for the vehicles busy on the holding’s production sites.

The filling/payment operations get activated through a contactless payment card, which speeds up the entire process and excludes the human factor (the mobile filling stations do not have a human operator to go with them). All the transaction data get processed automatically and fed into the system.


Other materials on the topic::