Ural Federal District‘s electric power output goes down 0.3%

13 August 2015 (09:16)

UrBC, Yekaterinburg, August 13, 2015. Ural Federal District‘s power stations produced 148.4bn kilowatt-hours of electric power between January and July 2015, which was 0.3% less than a year earlier, the local subsidiary of United Power Systems/SO UPS reports.

148.8bn kilowatt-hours of electric power were consumed, down 0.9% on a year earlier.

At the same time, electric power output actually increased by 1.6% (up to 19.8bn kilowatt-hours) in July 2015 compared with July 2014.


Other materials on the topic::