26 July 201613:20
Ural Vagon Zavod Speeds Up Engine Assembly 5.5%
UrBC, Yekaterinburg, July 26, 2016. Ural Vagon Zavod Corporation’s Electromachine now needs 5.5% less time to get its electric motors assembled, and this at the same cost, the corporation’s press service refers to head of Lean Production Group Denis Akmedyanov as saying. The enterprise introduced a lean production committee, chaired by Electromachine Director-General Igor Afanasiev, in February 2016. Meetings are held directly on production sites, including Building 16 in March, Building 4 in April, and Building 6 in May. The agenda of these meetings covered the launch of the 5S system,