27 April 201717:11
Yekaterinburg Arena Gets Air Conditioning
UrBC, Yekaterinburg, April 27, 2017. Sinara Group’s Sinara Development, the general contractor for the reconstruction of Yekaterinburg stadium in time for the World Cup 2018, is now working on introducing air conditioning on the site. According to the Group’s press service, five large cooling appliances are being installed at a specially equipped location to provide air conditioning in all the rooms under the spectator stands. The cooling units are quite unique in their size and capacity (up to 2,630 kilowatts). This is how much a stadium needs to make sure all the air ducts (23,000 meters