25 May 201809:31
Yekaterinburg: Water Supply System Checks Reveal 35 Damage Spots
UrBC, Yekaterinburg, May 25, 2018. Yekaterinburg heating, power, and water supply services carried out the first stage of their annual hydraulic tests on water pipes to find thirty-five defects in the pipelines, ETK’s press service reports. The tests were carried out between 11 PM on May 21 and 7 AM on May 24, with limited hot water supply to end users. The hydraulic pressure tests necessitated bringing the overall pipe pressure to above average to ensure compliance with the technical requirements. Damage spots were detected in Lenin Ave-Khokhryakov St, Vainer St-Popov St, Onufriev St,