22 February 201909:17
FGC UES Gets Surgutskaya-Pyt-Yakh Main Infrared Tested
UrBC, Yekaterinburg, February 22, 2019. Federal Grid Company United Energy Systems had its 500-kilowatt Surgutskaya Power Station-Pyt-Yakh Main tested with infrared appliances, FGC UES Western Siberia’s PR & Media Group reports. The main got examined with a thermal imaging unit (from a helicopter). The testing confirmed that the main is fully ready to handle maximum workloads at peak times. ‘The infrared diagnostics’ main advantage is that you can measure the temperature of spots where the cables intersect with shield wires remotely; this means the entire main can get safely inspected