Главная > Daily news > RosSet’s FGC UES Replaces Insulators at Chelyabinsk Region’s Power Stations

RosSet’s FGC UES Replaces Insulators at Chelyabinsk Region’s Power Stations


25.03.2020
UrBC, Chelyabinsk, March 25, 2020. New insulators are being installed at RosSet’s Federal Grid Company United Energy Systems’ seven power substations in Chelyabinsk Region, FGC UES’s Ural division’s PR & media group reports.

The insulators are being replaced at RosSet’s Federal Grid Company United Energy Systems’ transmission substations in Chelyabinsk Region, including the 500-kV Kozyrevo Substation, Kropachevo Substation, and Magnitogorskaya Substation. 612 new cylindrical post insulators will get installed within all the switching equipment.

The replacements at the 500-kV Shagol Substation have by now been completed; 96 insulators have been installed at two feeder disconnectors at the 500-kV Shagol-Chelyabinskaya Main. The line is now fitted with new, highly durable, Russian-made insulators that are resistant to drastic temperature fluctuations.

All the replacements are meant to make maintenance of high-voltage appliances safer and to minimize tech problems resulting in power outages.

Cylindrical post insulators help fix and insulate current-conducting components of power-generating equipment.
Вернуться назад