Beloyarskaya nuclear power plant sums up its achievements for January 2006
3 February 2006 (10:44)
According to the company’s spokesperson, BN-600 power-generating unit of Beloyarskaya nuclear power plant produced the rated output in January 2006. The electricity-generation schedule was complied with.
There weren’t any limit or safety violations of any kind, and the rare gas activity breakthrough in January comprised 0.17% of the upper limit.
The radiation level in the town of Zarechniy and the power plant site was not any bigger than usual and fluctuated between 5.5 and 5 microroentgen per hour, which is believed to be typical of Russia. The corresponding figures for Beloyarskoye reservoir water are 0.16 becquerel per litre, with the figures for head water being 0.074-0.3 becquerel per litre.
There weren’t any limit or safety violations of any kind, and the rare gas activity breakthrough in January comprised 0.17% of the upper limit.
The radiation level in the town of Zarechniy and the power plant site was not any bigger than usual and fluctuated between 5.5 and 5 microroentgen per hour, which is believed to be typical of Russia. The corresponding figures for Beloyarskoye reservoir water are 0.16 becquerel per litre, with the figures for head water being 0.074-0.3 becquerel per litre.
Embed to Blog | Subscribe to Newsletter |
Other materials on the topic::
- Beloyarsky nuclear power plant sums up operation regime of BN-600 in September 2006
- Beloyarskaya nuclear power station sums up results of its activity in August 2006
- Beloyarskaya nuclear power station sums up results of its activity in June 2006
- Beloyarsky nuclear power plant sums up the operation regime of BN-600 in March 2006
- Power generating unit of Beloyarskaya nuclear power plant fully meats electricity-generating requirements for 2005